Get a detailed presentation about the system.

The presentation will be sent to your email address. The service team will be available for further assistance via WhatsApp.

Cities & Projects

Land in Gedera: a snapshot of the planning, the compounds and ILA tenders

This page brings together in one place what matters about land in Gedera: what has already been approved, what is still in planning, how much state land was marketed in the town through tenders, and what to check before buying. Each topic has a detailed article, and the links are inside.

  • The ERRA team
  • Published
  • 5 min read
Land in Gedera: a snapshot of the planning, the compounds and ILA tenders

The bottom line

Gedera's outline plan and the southern compounds have already been approved. West Gedera, Compound 8, is still in planning at VATMAL, and construction there is expected only after 2030. Anyone looking at land in Gedera first checks which compound the parcel is in, and what stage its plan has reached.

2019
Outline plan approval
8,000+
Housing units planned in West Gedera
2030+
Estimated start of construction in Compound 8

Planning in Gedera, in brief

  1. 1
    The outline plan, 2019

    Plan 453-0340554 was deposited in 2017 and approved in February 2019, and its target year is 2040. It marks Compound 8 as a future residential development area. An outline plan does not yet allow building permits to be issued.

  2. 2
    Preferred housing area, 2024

    The Ministerial Committee declared West Gedera a preferred housing area, and the declaration is anchored in Government Resolution 1367. Handling of the plan passed to the national committee, VATMAL.

  3. 3
    Approval of the southern compounds, 2024

    903 housing units and a district park in southwest Gedera received final approval.

  4. 4
    Round table at VATMAL, January 2026

    TAMAL 3011 has grown to 8,000 housing units, with about 420,000 m² of employment space and Route 40 shifted westward.

  5. 5
    Expansion of the declaration, June 2026

    The declared area has grown from about 1,190 to about 3,000 dunams, with more than 8,000 housing units, a park and a stadium in the Nahal Sorek area.

The full timeline, with what each stage means for landowners: Gedera 2015–2035.

The compounds at a glance

CompoundWhat is plannedStage
Compound 2, southwest GederaResidential: 903 housing units and a district parkApproved
Compound 7, Shamir ParkAn employment area of about 450,000 m² in south GederaDeposited in October 2024. The objections were heard, and the plan has not yet come into force
Compound 8, West GederaResidential: more than 8,000 housing units, in TAMAL 3011In preparation at VATMAL. The plan has not yet been deposited
Compound 9PreservationNo building rights

The full article: Compounds 2, 7, 8 and 9 in Gedera.

What is expected next

According to the current estimate, TAMAL 3011 coming into force and the approval of the balancing and allocation tables are expected in 2028–2030, and building permits and the start of works from 2030 onward. This is an estimate, not a commitment: the plan has not yet been deposited, and the timetable is not guaranteed.

ILA tenders in Gedera: how much state land was marketed

The table brings together the Israel Land Authority tenders in Gedera in which a winner was determined, by the year of the tenders committee. It shows how much construction-ready land reached the market in the town, which is part of the supply picture.

YearDesignationTender typeLots soldhousing units
2016High-density constructionMechir LaMishtaken (Buyer's Price)4143
2018High-density constructionMechir LaMishtaken (Buyer's Price)2366
2019Low-rise constructionUnspecified-plot tender and regular public tender1736
2020Low-rise constructionRegular public tender38
2021Low-rise constructionRegular public tender18
2022High-density constructionRegular public tender18

In 2019, 2022 and 2024, industrial plots were also marketed in Gedera: 7, 5 and 2 plots.

What to check before buying land in Gedera

  1. 01Which compound is the parcel in? Compound 2 is approved, Compound 7 is at the objections stage, Compound 8 is in preparation at VATMAL, and Compound 9 is designated for preservation.
  2. 02Check the parcel in ERRA Analytics Search by block and parcel, see which plans apply to it and at what status, and compare with transactions nearby.
  3. 03Is the parcel inside the updated area? The declared area in West Gedera grew in June 2026, and its boundaries changed. Check whether the parcel is inside the updated area.
  4. 04What is the proposed designation? Residential, employment, road, park or public buildings. How much is allocated to each landowner will be determined only in the balancing and allocation tables.
  5. 05What does the appraisal say? For land that is not available for construction you receive a Standard 22 appraisal, and compare it with the planning status.

FAQ

When was Gedera's outline plan approved?

In February 2019. The plan number is 453-0340554, and its target year is 2040.

How many housing units are planned in western Gedera?

More than 8,000, according to the updated declaration of June 2026. The outline plan referred to about 2,000, and the original 2024 declaration to about 3,000.

When will construction begin in Compound 8 in Gedera?

According to the current estimate, not before 2030. The plan has not yet been deposited, and the timetable is not guaranteed.

Why is the West Gedera plan being discussed at VATMAL?

West Gedera was declared a preferred housing area in 2024, so its plan is discussed at VATMAL and not in the District Committee.

Where can you see what stage the plan is at?

On the Planning Administration's planning information website, by plan number or by block and parcel, and also in ERRA Analytics.

Summary

Gedera has compounds at several stages: an approved compound, an employment compound at the objections stage, and a large residential compound in the west that is still in preparation at VATMAL. So the first question is always which compound the parcel is in, and what stage its plan has reached. This page is current as of November 2026. The information is general and is not investment advice or planning advice.

Further reading and tools on the site

Articles

Tools and pages

Sources

  1. 01Taba Now: Gedera's outline plan, 453-0340554
  2. 02Declaration of a preferred housing area, West Gedera (PDF)
  3. 03Merkaz HaNadlan: 450 thousand m² for commerce, employment and industry, the District Committee approved a plan in Gedera
  4. 04Gedera HaYom: A train beyond the horizon
  5. 05Gedera HaYom: Gedera is growing
  6. 06Ice: about 8,000 new apartments to be built in Gedera
  7. 07Israel Land Authority: the tenders website
  8. 08Girsaot LaAm (over.org.il): index of ILA tenders, processed information
  9. 09Planning Administration: About VATMAL

Written by

The ERRA team

Published: 24.11.2026

Share

More articles

All articles

Need us to make an appointment for you? Talk with us!

The Israeli Real Estate market is in continuous momentum and prices continue to rise from moment-to-moment. Let us match you with the right investment for you.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.